- JVS Export is located in the industrial area of Velampadi Village, Aravakurichi Taluk. It is approximately 35 km away from Karur Bus stand and 36 km away from Karur Railway Station
- 100% Heat Island reduction by installing Hardscape Materials with SRI value >80%
- Over 60% of the Regularly occupied space have been designed to ensure sufficient daylighting.
- 30% of parking facility will be provided with Electric charging units.
- All worker safety and welfare measures were taken as per the NBC standards during the construction.
The development achieves 50% potable water savings by installing water efficient plumbing fixtures.
100% waste water is treated to tertiary standards and will be used for landscaping & flushing purposes.
The site is a zero discharge site with 100% of rain water is harvested.
Highly efficient landscape irrigation systems are planned to ensure required water quantity is used for landscape maintenance.
Domestic Water quality will be regularly tested to ensure all BIS norms are met.
All major sources of water consumption will be sub metered and monitored on a regular basis to identify any wastage.
The project will install Efficient Glazing to reduce the incident solar radiation entering the building.
The project has proposed to install BEE 5 star rated equipments in the factory.
100% of common area lighting demand will be met through Solar PV
Energy meters will be installed in all major energy consuming areas including manufacturing unit, bore water pumping, drinking water pumping, external lighting, Air Conditioning.
All AC equipment is free of Chlorofluorocarbons and HCFCs.
- The materials are ensured to be procured locally that can be used for various building materials in the project
The project uses third party certified Green Products thereby reducing the environmental overall impact.
Most of the Construction waste will be reused at site or sent for Recycling.
The project proposes to use alternate materials for project construction purposes.
The project is designed to ensure over 80% of the regularly occupied spaces have Enhanced Ventilation and Daylighting.
All paints, sealants, adhesives to be used in the project are Low VOC and non toxic.
50% of the Building Occupants has Connectivity to the Exterior View.
All common areas in the building will be declared as no smoking zones.
The inherent design goal of the project team was to ensure the buildings remain comfortable even if they are non-air conditioned.